首頁/產業資訊/SSI SCHAEFER implements a full

SSI SCHAEFER implements a full

SSI SCHAEFER implements a full

SSI SCHAEFER implements a fully automated high bay warehouse

The pharmaceutical company Fresenius Kabi opens a state of the art central warehouse at the Cargo Center Graz (CCG)

 

In mid-2008 Fresenius Kabi decided to build a logistics center at the Cargo Center Graz (CCG). The ideal infrastructure as well as the immediate proximity to the manufacturing plant - located south of Graz, Austria - layed the foundations for this decision.

 

In SSI SCHAEFER Fresenius found an ideal and reliable partner, always making sure that the demanding project was realised as quickly as possible. Fresenius assigned SSI SCHAEFER with the conception, planning and realisation of a fully automated high bay warehouse including two stacker cranes and double-deep storage. This, on the other hand allows the storage of two or three pallets in the double-deep storage columns, depending on the respective pallet type.

 

The central warehouse

Due to the latest warehouse technology, three temperature zones ranging from minus 15 degrees C° to room temperature, an oxygen-reduced, fully automated high bay warehouse, a clean area for the sampling of resources as well as a state of the art monitoring system, the new central warehouse at the Cargo Center Graz exceeds the high expectations of the pharmaceutical industry as well as the official national and international requirments.

 

After the enormous growth over the past few years, a highly efficient and central logistics solution was developed for Fresenius. Today, 11,000 pallet storage locations offer sufficient space for the positive developments expected for the future.

 

The Fresenius Kabi logistics center will accomodate the company's warehouse management, the goods-in area and picking area. At the same time, it will serve as the base for the company-owned trucks, which supply hospitals and pharmacies throughout Austria. Moreover, the logistics center will be used as the central logistics interface to supply Eastern European markets as well as patients from all over the world - from Latin America to Southeast Asia - with products made in Graz.

 

The entire system comprises 2 SSI SCHAEFER stacker cranes, which are controlled by the logistics software WAMAS. The conveying system contains 36 drive units. The overall system is operated by the control system WAMAS including 490 digital inputs and 236 digital outputs. Simultaneously, the WAMAS material flow calculator controls the flow of goods on the conveying systems and ensures the transport to and from the 7,500 pallet storage locations within this unit.

 

 

 

 

Scope of delivery SSI SCHAEFER, Wels

SSI SCHAEFER Wels was in charge of the planning, shipment and installation of the high bay warehouse in SILO design, comprising two aisles for two fully automated stacker cranes with double-deep storage. This racking system with a lenght of 94m, a width of 15m and a height of 26m provides a storage capacity for 7,500 Euro and industrial pallets. At the same time, a conveying system platform as well as two other platforms for ventilation units in the upper warehouse level were integrated.

 

Fresenius Kabi Austria GmbH

Since 1997 the company Fresenius Kabi Austria GmbH, a subsidiary of the global health care group Fresenius SE, specialises in the development, production and distribution of pharmaceuticals and medical care products for the intravenous and nutritional therapy. Fresenius Kabi in Graz, Austria, offers a range of steril infusion solutions such as anesthetics, antibiotics as well as a number of products for intravenous nutrition. The production processes of sterile pharmaceuticals are subject to strict official regulations, especially when it comes to the storage of resources, the production and quality control as well as the storage and transport of the final product.

 

The company CCG Immobilien GmbH, a subsidiary of CCG and the company Porr, commissioned the project and was in charge of the entire implementation process.

 

Peter Pittino, CEO of CCG Immobilien GmbH concludes:

„Our ambition was to capture all relevant factors for the logistics project in little time and to mutually integrate these ideas in the building project. All project participants have nailed this task in an extremely impressive manner.“

 

 

Friesach (Graz), November 2009

 

 

Captions to the photographs:

- Steel framework, high bay warehouse

- Steel framework construction

- Handover locations of stacker cranes

- Groundbreaking

- Warehouse, external view

- System layout

 

Sources of photographs:

- Cargo Center Graz

- SSI SCHAEFER (System layout)

 

打造主動式行銷官網自動媒合訂單,AI協助優化網站排名

關鍵字:

https://0227479394.web66.com.tw/web/News?postId=1328527自律神經失調檢測儀器-調理治療物品販售

自律神經失調檢測儀器-調理治療物品販售

詢價留言

您好,如有任何詢價需求,請善用這裡的【詢價留言】我們在收到您的留言時,會盡快處理及回覆!

驗證碼圖片驗證碼圖片驗證碼圖片驗證碼圖片
同步成為台灣黃頁詢價供應商。
To:
開楠銘

聯絡人:劉小姐

Email:i*o*@cainamin.com

詢價回覆率:100%

相關廠商/供應商

  • 上永事業
  • 協展貿易
  • 擇鑫科技
填寫詢價單